Skip to main content
Southwest Rankin Water Association
Committed to Providing Clean, Safe Water for All Our Residents
(601) 845-2440
Contact Us
(601) 845-2440
Contact Us
Menu
  • Home
  • Customer Service
    • Contact Us
    • New Service Request
    • Rates & Policies
    • Meter Reading
    • Bill Payment
    • About Us
    • Personnel
    • Location
  • Forms & Reports
    • All Forms & Reports
    • Water Quality Report
    • Drought Contingency
  • News & Notices
    • Recent News
    • ALERTS
    • Board Members
    • Board Meetings & Minutes
    • Current Projects
    • Proposed Projects
    • Conservation Tips
  • Resources
    • FAQ
    • Archived Agendas
    • Archived Minutes
    • Archived Documents
Bill Payment Drought Contingency Water Quality Report

Alerts

GENERAL NOTICE Area: Old Pearl

May 29, 2025

HOW ALERTS WORK

November 20, 2024

Sign Up for Alerts

Unsubscribe

Local Weather
Today Tomorrow Saturday
Thunderstorm with rain
89°/72°
Thunderstorm with rain
90°/73°
Scattered clouds
94°/72°

Alert

Alerts

GENERAL NOTICE Area: Old Pearl

May 29, 2025

GENERAL NOTICE Area: Old Pearl

Southwest Rankin Water Association, Inc. (SWRWA) has received a Rural Water Association Infrastructure Grant (RWAIG), administered by the Mississippi State Department of Health (MSDH), to replace the existing older, smaller-diameter, deficient PVC waterlines in Simpson County with new and larger-diameter PVC waterlines.  This will provide customers with increased pressure, water supply, reliability, and overall water service.  Waterlines on the following roads will be replaced and/or upgraded.

 

  • Old Pearl:  From Gatesville to Hopewell.
  • Hopewell:  From Old Pearl West to End of Water System.
  • Gatesville:  From Old Pearl West to End of Water System.
  • Joe Dear:   From Old Pearl East to H Dear.
  • H Dear:   From Joe Dear South to Old Pearl.

 

The RWAIG 2021 Water System Improvements Project was competitively bid on November 1, 2024, and a contract was awarded to Edge Utilities, Inc. in the amount of $1,215,401.25.  Construction is expected to begin in Summer 2025 and is anticipated to be completed in late Fall 2025.  During construction, customers will encounter heavy equipment and personnel working on county roads, county rights-of-way, private easements; excavations (including excavations in customers’ yards that fall within county ROW or private easements); some traffic delays; and many could experience temporary water outages.  The Association asks for your patience and understanding.  SWRWA’s customers can look forward to increased water flow and pressure, less frequent water outages, and increased water quality upon completion of the project. 

 

For more information contact Southwest Rankin Water Association, Inc.’s office at 601-845-2440.

 

Alerts

GENERAL NOTICE Area: Old Pearl

May 29, 2025

GENERAL NOTICE Area: Old Pearl

Southwest Rankin Water Association, Inc. (SWRWA) has received a Rural Water Association Infrastructure Grant (RWAIG), administered by the Mississippi State Department of Health (MSDH), to replace the existing older, smaller-diameter, deficient PVC waterlines in Simpson County with new and larger-diameter PVC waterlines.  This will provide customers with increased pressure, water supply, reliability, and overall water service.  Waterlines on the following roads will be replaced and/or upgraded.

 

  • Old Pearl:  From Gatesville to Hopewell.
  • Hopewell:  From Old Pearl West to End of Water System.
  • Gatesville:  From Old Pearl West to End of Water System.
  • Joe Dear:   From Old Pearl East to H Dear.
  • H Dear:   From Joe Dear South to Old Pearl.

 

The RWAIG 2021 Water System Improvements Project was competitively bid on November 1, 2024, and a contract was awarded to Edge Utilities, Inc. in the amount of $1,215,401.25.  Construction is expected to begin in Summer 2025 and is anticipated to be completed in late Fall 2025.  During construction, customers will encounter heavy equipment and personnel working on county roads, county rights-of-way, private easements; excavations (including excavations in customers’ yards that fall within county ROW or private easements); some traffic delays; and many could experience temporary water outages.  The Association asks for your patience and understanding.  SWRWA’s customers can look forward to increased water flow and pressure, less frequent water outages, and increased water quality upon completion of the project. 

 

For more information contact Southwest Rankin Water Association, Inc.’s office at 601-845-2440.

 

HOW ALERTS WORK

November 20, 2024

How alerts work: Everyone who is signed up for alerts will receive all alerts whether they pertain to your account or not. 

Contacts

Southwest Rankin Water Association
201 South County Line Road
Florence, MS 39073
View Map
(601) 845-2440
Send Us a Message

Related Links

  • National Rural Water Association
  • Mississippi Rural Water Association
  • Water Conservation Tips
  • Environmental Protection Agency
Translated by Google

© 2025 All rights reserved. | Privacy Policy | Terms of Service | Accessibility
Return to top of page
Powered by RuralWaterImpact.com - Smart Websites for Smart Water Systems™
Admin